Services · Kitchen Renovation in DubaiUnited Arab Emirates · Dubai
Service

Kitchen Renovation in Dubai

Custom kitchen renovations — cabinetry, stone worktops, integrated MEP and finishing, designed and built in-house in Dubai.

Get a free quote WhatsApp us
What's involved

Kitchens designed around how you actually cook and host.

A kitchen renovation is half engineering, half design. We coordinate cabinetry, stone, MEP and appliances together from day one — so the worktop joints, plug sockets, extract hood and lighting end up exactly where you need them, with no costly rework on site. In Downtown Dubai and Marina towers, we plan delivery and installation around building access windows and lift bookings, too.

Bespoke walnut kitchen with stone worktops in a Downtown Dubai apartment renovation
At a glance

Timeline, scope and approach.

Typical timeline

4–8 weeks

Stone fabrication usually drives the critical path.

How we work

One accountable team

Design, build and in-house joinery under one roof — one team answerable from first drawing to final snag.

Scope

Design → install

Layout, cabinetry, worktops, splashbacks, appliances, plumbing/electrical, finishing.

What it includes

Every stage of the work, handled by one team.

01

Layout & design

Working layout that respects existing services and your cooking style. 3D walkthrough before fabrication.

02

Cabinetry

Custom carcass built in our workshop, soft-close hardware, choice of laminate, veneer or matte/gloss painted finish.

03

Worktops

Quartz, porcelain or natural stone — templated and fabricated to tight tolerances.

04

Appliances & MEP

Hob, oven, hood, fridge and dishwasher integration. Power and water reroutes coordinated with the apartment scheme.

05

Splashback & flooring

Tile, stone or glass splashback; flooring continuity into living areas where possible.

06

Snagging

Cabinet alignment, drawer pulls, silicone joints and finishing all checked before handover.

Frequently asked

Quick answers about kitchen renovation in Dubai.

How long does a kitchen renovation take?

Four to eight weeks. Stone fabrication is usually the longest single step.

Can NovaPlex supply the appliances?

Yes — we can specify and source, or work with your preferred brand and dealer.

Do you work with open-plan kitchens?

Yes. We coordinate the kitchen with the surrounding living/dining design so the result feels integrated, not bolted on.

Can you move the plumbing and add an island?

Yes, subject to the building's drainage and slab. We survey the existing services first, then design the layout — including islands and relocated sinks or hobs — around what the building allows. Any wet-area changes go through the developer NOC.

Do you make the kitchen cabinetry yourselves?

Yes. Our kitchen joinery is built in our own workshop — solid carcasses, soft-close hardware and water-resistant finishes — rather than flat-packed, so it is sized exactly to your space.

Can you achieve a European kitchen look for less?

Often, yes. We can specify European hardware and finishes and build the carcasses locally, which gives a comparable result without the full imported-kitchen lead time and cost. We show you the options at quote stage.

Start your project

Get a fixed-fee quote for your kitchen renovation.